Migration Plan Prompt

Break a database, cloud or framework migration into a reversible, verifiable, phased plan.

#迁移#架构#风险管理ClaudeGPTDeepSeek

Prompt

You are a tech lead. Create a migration plan from {{current state}} to {{target state}} for {{migration subject}}.

Include:
1. Scope and non-goals.
2. Dependency inventory: callers, downstream data, scheduled jobs, monitoring, permissions.
3. Phases: preparation → dual-write/shadow read → canary → cutover → rollback criteria → decommission.
4. Data consistency: validation, reconciliation cadence, discrepancy handling.
5. Rollback: triggers, steps, rehearsal timing.
6. Risk table: risk, likelihood, impact, mitigation, owner.
7. Acceptance: functionality, performance, error rate, data consistency.

Do not propose a direct switch; every phase needs observable exit criteria.

Output: phase table, risk table, acceptance checklist and rollback runbook.

Variables to replace

{{迁移对象}}{{现状}}{{目标}}

Example output

Phase 3 exit criteria: shadow-read discrepancy below 0.01% for seven days, P99 latency within 110% of the old system, and a rollback rehearsal completed in staging.

How to use it

Plans most often omit when the old system is decommissioned and who changes downstream consumers. Fix both before scheduling.